Mrs Kerins wanted to modernise her old bathroom and upgrade from a slow electric shower to a power shower. New suite installed and tiling throughout. With the introduction of 4 x spot lights for the wow factor. New chrome towel rad introduced as the old bathroom did not have a radiator.

bathroom modernisation leeds 5

Before

Bathtub as it was.

bathroom modernisation leeds 2

After

New tiling, power shower and surround.

bathroom modernisation leeds 4

Before

Toilet and basin as it was.

bathroom modernisation leeds 3

After

New toilet and basin.

bathroom modernisation leeds 1

After

Completed bathroom.