Adam has been renovating his home gradually. He was never happy with the original bathroom and wanted a bath introducing while maintaining the shower aspect. Adam liked the original toilet and basin so we reused the ceramic wear but replaced the toilet internals and basin taps and waste. The brief also included an introduction of a shelf within the shower space.

Budget £3800
bathroom renovation leeds 3

Before

bathroom renovation leeds 5

After

bathroom renovation leeds 2

Before

bathroom renovation leeds 6

After

bathroom renovation leeds 1

Before

bathroom renovation leeds 4

After